KASS v.2.2. Scheduling Software for Construction with Optimization Criteria Description |
M. KrzemiĆski
Warsaw University of Technology, Civil Engineering Department, Warsaw, Poland |
Full Text PDF |
The paper presents fourth version: of specialist useful software in scheduling KASS v.2.2 (Algorithm Scheduling Krzeminski System). KASS software is designed for construction scheduling, specially form: flow shop models. The program is being dedicated closely for the purposes of the construction. In distinguishing to other used programs in tasks of this type operational research criteria were designed closely with the thought about construction works and about the specificity of the building production. The minimal time, the minimal slack of brigades, the minimal slacks of the chosen working brigade and costs of the transfer operation of working fronts are included in operational research criteria between work centers. It is possible to enter data into the program both by hand as well as to load the Excel from files, similarly is with results, they are presented on-screen as well as a possibility of enrolling them in the existing file Excel. An element is very valid for it since allows for further simple processing of received results. In providing software for performing operational research calculations a technique of the complete review and simulation technology are being exploited. A program describing algorithms is used which will stay in the article as well as shown computational examples will remain. |
DOI: 10.12693/APhysPolA.130.1439 PACS numbers: 89.20.Kk, 89.75.Fb |